Red Hook WatchIndependent Community Resource

8 2022

Meetings/Documents/wwtp::1823_8-2022
Working document2022-08-01

==> picture [216 x 50] intentionally omitted <==

----- Start of picture text -----

7467 South Broadway, Red Hook, New York 12571 4V4 Village ofRedHook Water & Wastewater Treatment 3) Tirpunvental 10/03/2022 Cousulting ----- End of picture text -----

==> picture [462 x 302] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater Systent Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collected from each well | [Wastewater][ System][ Notes:] [Sample][ results][ for][ August][ 2022,] [with][ reporting][ submitted][ on] [or] with below regulatory limit results. We are currently working with Delaware Engineering | before September 28th 2022. te try and get reduced monitoring requirements. Monthly Total Coliform All monthlywith no presence coliform of testscoliform were or completed e. coli A UY as rc RequiredcBOD Somples Result<4.0 Compliance phe NH3TSS <0.5022 1.8110 mg/Lmg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies WellWeil 39 Pressure Vent Gauge ScheduledScheduledforfor week week of of 10/1210/12 Anoxic Mixers moving.CurrentlyfyMayies need iidto considerertthis to in future4te updates. wank solids Weill 15 Number Placard information has been sentfor sign to be made. l [nel][ Fiver][ Rebuite] Sand Filters have never been rebuilt or media replaced. Should Weil Control issues Well controls need to be evaluated as communication issues price and schedule for the nearfuture. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance parts have been ordered. Waiting for oil & belts. Town/Village interconnect —-2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in| pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to wells 14 & 15 as there is a short in wiring between the plant and the wells Storage Tank Inspections All storage tanks have been inspected and are awaiting report. For Future Notes: ----- End of picture text -----