Red Hook WatchIndependent Community Resource

12 2020 Dec 4th Q

Meetings/Documents/wwtp::1790_12-2020-Dec---4th-Q
Working document2020-12-01

==> picture [233 x 47] intentionally omitted <==

----- Start of picture text -----

4 7467VillageSouth ofRedBroadway,Hook WaterRed Hook,& Wastewater TreatmentNew York 12571 att D” Date: 01/04/2021 ----- End of picture text -----

Consulting

==> picture [490 x 344] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collected from each well |Wastewater System Notes: 4th Quarter samples due by December 31st. with below regulatory limit results. We are currently working with Delaware Engineering to try and get reduced monitoring requirements. All monthly coliform tests were completed, Required Samples Result Compliance Monthly Total Coliform Traditions,along withwith @ 4th no presence of sample collectedcoliformfiromor e. . BODTSS Results 5 mg/L coli 4th Quarter Required Not 10 me/L anes NH3 Back 2.2 mg/L ; Special Samples 4thTesting quartercompleted PFOA/PFOS, and are1,4awaiting Dioxane Fecal Coliform Yet 200/100 mL results. Deficiencies Deficiencies WellWell 39 PressureVent Gauge DownwardWell 3 Pressurefacing Gauge vent required needs to beper replaced DOH. per DOH Anoxic Mixers solidsaeipl maving. a saeMay7 miner need toinp considerieithis invalinefuture updates. fenk WellWellell Control 15 Number Issues Placard WellWell 15 controls needs a need new to number be evaluated placard as per communication DOH issues ee SandShouldFi priceters have and schedule never beenfor rebuilt the near or mediafuture. replaced. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance Process blowers are long overdue for maintenance. Belts Town/Village interconnect 2020 test indicated this was not a viable option for Village and oils should be purchased for preventative maintenance. flow in case of emergency. Engineering review currently in | pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Well Level/Flow Weill fevel monitors have been reviewed with a variety of repairs that were required. Currently loaking at options for | gackflow Prev. Replacement Facilities backflow Preventor in need ofreplacement. communication to wells 14 & 15 as there is a short in wiring Pump Station Pump Failure between the plant and the wells P Pp Pump Station pump and check valve have been replaced. Storage Tank Inspections All storage tanks have been inspected and are awaiting Pump Station Lawn care Pump station in Need of weedwhacking. Does Village report. request C3ND to complete or Village personnel For Future Notes: ----- End of picture text -----