Red Hook WatchIndependent Community Resource

9 2021 September 3rd Q

Meetings/Documents/wwtp::1787_9-2021-September---3rd-Q
Working document2021-09-01

==> picture [242 x 55] intentionally omitted <==

----- Start of picture text -----

i 3ND%a 7467Date:Village 10/08/2021South ofRedBroadway,Hook WaterRed Hook, & WastewaterNew York 12571 Treatment Consulting ----- End of picture text -----

==> picture [489 x 319] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collected from each well |Wastewater System Notes: 3rd quarter sampling is due by September 30th. with below regulatory limit results, We are currently working with Delaware Engineering to try and get reduced monitoring requirements. All monthly coliform tests were completed, Required Samples Result Compliance Monthly Total Coliform along with a 4th sample collected from BOD 4 S mg/L Traditions, with na presence of coliform or e. TSS colt 3rd Quarter Required 14 10 mg/L , Samples NH3 0.5 2.2 mg/L ; Special Samples 3rdTesting quartercompleted PFOA/PFOS,and are1,4awaiting Dioxane Fecal Coliform <1.0 200/100 mL results, Deficiencies Deficienctes WellWell93 Vent Pressure Gauge DownwardWeil 3 Pressurefacing Gauge vent needs required to beper replacedDOH. per DOH Anoxic Mixers asolidsrently moving., MedoraMay miner need to p considerfacelo ‘hethis infotunin future fark updates,ti Well 15 Number Placard Well 15 needs a new number placard per DOH antler REBGG Sand Filters have never been rebuilt or media replaced. Well Control Issues Weil controls need to be evaluated as communication issues Should price and schedule for the nearfuture. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance Process blowers are long overdue for maintenance. Belts Town/Village Interconnect 2020 test indicated this was not a viable option for Village and oils should be purchased for preventative maintenance. flow in case ofemergency. Engineering review currently in | pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump auts. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | sackflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to wells 14 & 15 as there is a short in wiring Pump Station Pump Failure between the plant and the wells P ° P Pump Station pump and check valve have been replaced. Storage Tank inspections All storage tanks have been inspected and are awaiting Pump Station Lawn care Pump station in Need of weedwhacking. Does Village report. request C3ND to complete or Village personnel ----- End of picture text -----