Red Hook WatchIndependent Community Resource

8 2021 August 3rd Q

Meetings/Documents/wwtp::1786_8-2021-August--3rd-Q
Working document2021-08-01

==> picture [232 x 46] intentionally omitted <==

----- Start of picture text -----

7467 South Broadway, Red Hook, New York 12571 t,hl Village ofRed Hook Water & Wastewater Treatment 3ND Date: 09/08/2021 ----- End of picture text -----

Consulting

==> picture [489 x 319] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: The PFOA/PFOS, 1,4 Dioxane samples were collected from each well |Wastewater System Notes: 3rd quarter sampling is due by: September 30th. with below regulatory limit results. We are currently working with Delaware Engineering to try and get reduced monitoring requirements. All monthly coliform tests were completed, Required Si he Result Compliance Monthly Total Coliform along with a 4th sample collected from BOD Due 5 mg/L Traditions, with no presence of coliform or e. ss coli 3rd Quarter Required By 10 mg/L 2nd quarter PFOA/PFOS, 1,4 Dioxane Samples Fecal ColiformNH3 Sept 2.2 mg/L Special Samples Testing. completed with Satisfactorygit fa i saa 200/100#100 m mL results, Deficiencies Deficiencies WellWeill39 PressureVent Gauge DownwardWeill 3 Pressurefacing Gauge vent needs required to be per replaced DOH. per DOH Anoxic Mixers solidsehi.ently0 moving.MedoraMay eed. need toto consider place foveepthis inAnonfuture fonk updates., Well11515 NiNumber Placard Well 15 needs a new number placard per DOH F 7 andledier RSouiie Sond Filters have never been rebuilt or media replaced. Weill Control Issues Well controls need to be evaluated as communication issues Should price and schedule for the nearfuture. have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Blower System Maintenance Process blowers are long overdue for maintenance. Belts Town/Village interconnect 2020 test indicated this was not a viable optionfor Village and oils should be purchased for preventative maintenance. flow in case of emergency. Engineering review currently in| pump Station Pump Station pumps clogging issues have been an issue for place. same time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Weill Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | packfiow Prev. Replacement Facilities backflow Preventor in need ofreplacement. communication to wells 14 & 15 as there is a short in wiring Pump Station Pump Failure between the plant and the wells P P Pump Station pump and check valve have been replaced. Storage Tank inspections All storage tanks have been inspected and are awaiting Pump Station Lawn care Pump station in Need of weedwhacking. Does Village report. request C3ND to complete or Village personnel ----- End of picture text -----