==> picture [462 x 336] intentionally omitted <==
----- Start of picture text -----
7467 South Broadway, Red Hook, New York 12571 ¢ Village ofRed Hook Water& Wastewater Treatment uivanermme nt! 02/02/2023 Consulting Water System Wastewater System Water System Notes: Wastewater System Notes: Sample resultsfor December 2022, with reporting submitted on or before January 28, 2023. ; Monthly All monthly coliform tests were completed Required Samples Result Compliance Total Coliform with no presence of coliform or e. coli BOD <A0 December 2022 TSS 23 10 mg/L NH3 <0.5 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficlencles Weill Weil controls need to be evaluated as communication issues Control issues hiave occurred.d. DelawareDel EngineeringSoe is presenting, to new | anoxic— Mixers Currently a Medora mixer in place to keep Anoxic tank solids Town/Village Interconnect 2020 test indicated this was not a viable option for Village moving. May need to consider this in future updates. flow in case of emergency. Engineering review currently in Well Level/Flow Weill level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells 14 & 15 as there is a short in wiring Sand Filters have never been rebullt or media replaced. Should between the plant and the wells sand Filter Rebuild Pp.ice and schedule for the near future. Storage Tank Inspections All storage tanks have been inspected and are awaiting report. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. BlowerSystem Maintenance parts have been ordered. Waiting for oll & belts. Pump Station Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. ----- End of picture text -----