Working document2022-07-01

==> picture [216 x 43] intentionally omitted <==

----- Start of picture text -----

7467 South Broadway, Red Hook, New York 12571 ” ¢ Village ofRedHook Water & Wastewater Treatment 3 ov irennrsta 10/03/2022 ----- End of picture text -----

Cousulting

==> picture [462 x 302] intentionally omitted <==

----- Start of picture text -----

Water SystemWastewater System
Water System Notes:The PFOA/PFOS,1,4 Dioxane sampleswere collectedfrom eachwellWastewater System Notes:Sample resultsforAugust 2022,with reporting submitted
with below regulatory limit results.We are currently working with Delawere EngineeringbeforeSeptember28th 2022.
to try and get reduced monitoringrequirements.
MonthlyAllmonthly coliform tests were completedRequired SamplesResultCompliance
Total Coliformwith no presence ofcoliform or e. colicBoD<A0
July 2022TSS2.210 mg/L
NH3<0.501.81mg/L
Fecal Coliform<1.0200/100 mL
DeficienciesDeficiencies
WellWell 9 3 Pressure VentGaugeScheduledScheduledforfor week week of of10/1210/12Anoxic MixersCurrentlymoving.fAMayMedora needmixerto considerin lowethis7 inKeepfutureAnon updates. wanksolids
pete Wares ecardInformationhas been sentfor signto be made.
Sand Filter RebuildSand Filters have never beenrebuilt or media replaced.Should
Well Control IssuesWell controls need to be evaluated as communication issuesprice and schedulefor the nearfuture.
haveoccurred.DelawareEngineeringis presentingto new
Mayor.Train Down for ReviewOne process train is down for review of deficiencies.Reviewta
be completedthis week and sentfor review.
Blower System Maintenanceparts have been ordered.Waitingfor oll &belts.
Town/Villageinterconnect2020 test indicated thiswas not aviable optionfor Village
flow in case ofemergency.Engineering review currently inpump StationPump Station pumps cloggingissues have been an issue for
place.some time.Pump Station mixing shouid be implemented to
helpwith pumpfailure andpump station pump outs.
WellLevel/FlowWelllevel monitors havebeenreviewed with avariety of
repairsthat were required.Currently looking atoptionsforBackflow Prev.ReplacementFacilities backflow Preventor in need ofreplacement.
communicationtowells14 &15 asthereisa short inwiring
betweenthe plant andthewells
StorageTank inspectionsAll storagetanks have beeninspected and are awaiting
report.
For FutureNotes: