Red Hook WatchIndependent Community Resource

3 2022

Meetings/Documents/wwtp::1773_3-2022
Working document2022-03-01

==> picture [91 x 43] intentionally omitted <==

----- Start of picture text -----

7467 South %,- Village of ofRed 3} at pronametstal 05/03/2022 ----- End of picture text -----

7467 South Broadway, Red Hook, New York 12571 Village of ofRed Hook Water & Wastewater Treatment

Consulting

* We believe theTSS result was a lab error. all other compliance criteria met** We believe theTSS result was a lab error. all other compliance criteria met*
WaterSystemWastewaterSystem
WaterSystemNotes: ThePFOA/PFOS, 1,4Dioxanesampleswerecollectedfromeach wellWastewaterSystemNotes: SampleresultsforMarch2022, withreportingsubmittedonor
withbelowregulatory limitresults. Wearecurrentlyworking withDelawareEngineeringbefore April28th2022.
to tryandgetreducedmonitoringrequirements.
Allmonthlycoliform testswerecompletedRequiredSamples
Result
Compliance
withnopresenceofcolifarmare.coli
Milonthly TotalColiformcBOD
<4.0
UsedforUOD
TkN
5.7
calculation
;
;
4thquarterPFOA/PFOS, 1,4Dioxane
Special Samples
Testingcompletedandcamebackwith
Satisfactoryresults.

March 2022

UOD "UlimateOxygenDemand" ~—s-_«31,65 34mg/L Tss 30 10mg/L NHI 0.78 1.81mg/L FecalColiform <1.0 200/100mL

||Deficiencies||Deficiencies| |Weil9Vent Well3PressureGauge|Scheduledforweekof05/09 Scheduledforweekof05/09|AnoxicMixers|Curvently2 Mediansmixerogeetokeepsreetanksolids moving. Mayneed toconsiderthis in futureupdates.| |Weill15NumberPlacard|information hasbeensentforsign tobemade.|5AberREST|SandFiltershaveneverbeenrebuiltormediareplaced. Should| |WeilControlIssues|Wellcontrolsneedtobeevaluatedascommunication issues||priceandscheduleforthenearfuture.| ||have occurred. Delaware Engineering ispresenting tonew||| ||Mayor.|TrainDownforReview|Oneprocess train isdownforreviewofdeficiencies. Reviewto becompleted thisweekandsentforreview,| |Town/Villageinterconnect|—-2020 testindicated thiswas nota viable optionforVillage flowincaseofemergency. Engineeringreviewcurrentlyin place.|BlowerSystemMaintenance |pumpStation|partshavebeenordered. Waitingforoil& belts. PumpStationpumpscloggingissueshave been anissuefor some time. PumpStationmixingshouldbeimplementedtahelp| ||||withpumpfailure andpumpstationpumpouts,| |WeillLevel/Flow|Welllevelmonitors have been reviewedwith avarietyof repairs thatwererequired. Currentlylookingatoptionsfor communication to wells 14& 15 as thereis ashortin wiring||BackflowPrev. Replacement|FacilitiesbackflowPreventorinneedofreplacement.| ||between theplantandthe wells||| |Storage TankInspections|Allstorage tanks have been inspectedandareawaiting||| ||report,|||