Red Hook WatchIndependent Community Resource

1 2023

Meetings/Documents/wwtp::1759_1-2023
Working document2023-01-01

==> picture [216 x 49] intentionally omitted <==

----- Start of picture text -----

3 | s(IZi” tal 7467Village03/06/2023South ofRedBroadway,Hook WaterRed Hook,& Wastewater TreatmentNew York 12571 Consulting ----- End of picture text -----

==> picture [469 x 282] intentionally omitted <==

----- Start of picture text -----

Water System Wastewater System Water System Notes: Wastewater System Notes: Sample results for January 2023, with reporting submitted on or before February 28, 2023, Monthly Total Coliform; All monthlyno presence coliform oftestscoliform were ore. completed coli with RequiredBoDSamples Result<A0 Compliance January 2023 TSS 10 10 mg/L NH3 0.77 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies Town/VillageWell Control Issues interconnect 2020Waiting testfor indicatedSCADA update this was not a viable option for Village noneinoxic miMixers Carirently a Medora mixeressi place to keep Anoxic. tank solids; flow inf case of emergency. Engineering7 - review currently in. moving. May need to consider this in future updates. place. Weill Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells 14 & 15 as there is a short in wiring Sand Filters have never been rebuilt or media replaced. Should betweenetween the the plantplant and the wells Sand Filter Rebuild price and schedule for the nearfuture. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sentfor review. Btower System Maintenance pets oils and filters were replaced. Pump Station Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Backflow Prev, Replacement Facilities backflow Preventor in need of replacement. ----- End of picture text -----