Water Treatment Facilities Monthly Report — June 1, 2024

Meetings/Documents/att::2024-06-10_minutes_451__b06
Attached document2024-06-10

Village of Red Hook Water Treatment Facilities Monthly Report

June 1, 2024

System Flow

During the month of May the water treatment facility treated 7,630,808 total gallons, which is an average of 246,155 gallons per day. See below for the Annual Daily Average Flow Chart:

All bacteriological samples for the month were collected and transported to York Analytical, Newton, Connecticut. Please see below for sample locations and results:

LocationTotal ColiformE. Coli
Traditions Mail RmTraditions Mail RmAbsentAbsent
2 W. MarketAbsentAbsent
7331 S BroadwayAbsentAbsent

Chemical Usage

During the month of May, the water treatment plant used 75 gallons of sodium hypochlorite. The average daily use was 2.4 gallons per day.

If you should have any questions in regards to this report, please feel free to reach out to me at our main office at (845) 244-0129 or by email at Fernando@C3NDEnviro.com

Sincerely, Fernando Dongo Principal Consultant C3ND Environmental Consulting

0

0

Village of Red Hook Water Treatment

7467 South Broadway, Red Hook, New York 12571

==> picture [36 x 6] intentionally omitted <==

----- Start of picture text -----

06/01/2024 ----- End of picture text -----

==> picture [441 x 323] intentionally omitted <==

----- Start of picture text -----

Water System Water System Notes: Monthly Total Coliform All results absent for the month Deficiencies Well Control Issues Avanti Controls said panels are in final stages and will be ready for installation in the beginning of May. Stissing Electric says ground work is currently being laid. Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow in case of emergency. Engineering review currently in place. Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for communication to wells Well Level/Flow 14 & 15 as there is a short in wiring between the plant and the wells Well 13 & 14 Project Waiting for well pump data to finalize VFD startup. Avanti Controls is going to pull the data from the old VFD'S for both wells. For Future Notes: ----- End of picture text -----