Village of Red Hook Water Treatment Facilities Monthly Report
October 1, 2023
System Flow
During the month of September, the water treatment facility treated 7,166,100 total gallons, which is an average of 238,900 gallons per day. See below for the Annual Daily Average Flow Chart:
All bacteriological samples for the month were collected and transported to Pace Analytical Services, Newburgh, New York. Please see below for sample locations and results:
| Location | Total Coliform | E. Coli | |||
|---|---|---|---|---|---|
| Mail Rm. Traditions | Absent | Absent | |||
| 2 W. Market | Absent | Absent | |||
| 29 E. Market | Absent | Absent |
Chemical Usage
During the month of September, the water treatment plant used 75 gallons of sodium hypochlorite. The average daily use was 2.4 gallons per day.
If you should have any questions in regards to this report, please feel free to reach out to me at our main office at (845) 244-0129 or by email at Fernando@C3NDEnviro.com
Sincerely,
Fernando Dongo Principal Consultant C3ND Environmental Consulting
Microbiological Sample Resu
NEW YORK STATE DEPARTMENT OF HEALTH
Water Systems Operation Repor
Bureau of Water Supply Protection
==> picture [441 x 564] intentionally omitted <==
----- Start of picture text -----
Public Water System Name Reporting Month/Year Date Report Submitted Source Water Type(s) Village of Red Hook Sep-23 10/1/23 ☐Surface ☒Ground☐GWUDI Public Water System ID County Town, Village, or City ☐Purchase with subsequent chlorination NY1302775 Dutchess Red Hook ☐Purchase w/out subsequent chlorination Chlorination Comments/Observations Treated water Liquid Free chlorine DATE Source(s) in Use (1,000/day)volume Hypochlorite added to crock (quarts) entry point residual at (mg/l) 1 1,3,4,9,12,13,14,1Well 230.2 20.00 1.1 Well 2 1,3,4,9,12,13,14,1 211.8 1.0 Well 5 3 1,3,4,9,12,13,14,1 189.7 1.1 Well 5 4 1,3,4,9,12,13,14,1 210.6 40.00 1.2 Well 5 5 1,3,4,9,12,13,14,1 210.9 1.1 Well 5 6 1,3,4,9,12,13,14,1 252.9 20.00 1.2 Well 5 7 1,3,4,9,12,13,14,1 248.8 1.2 5 8 1,3,4,9,12,13,14,1Well Well 262.9 40.00 1.1 9 1,3,4,9,12,13,14,1 243.5 1.1 Well 5 10 1,3,4,9,12,13,14,1Well 240.4 1.1 11 1,3,4,9,12,13,14,1 286.8 20.00 1.2 Well 5 12 1,3,4,9,12,13,14,1Well 216.6 1.2 13 1,3,4,9,12,13,14,1 237.3 40.00 1.1 Well 5 14 1,3,4,9,12,13,14,1 237.8 1.1 Well 5 15 1,3,4,9,12,13,14,1 240.2 1.1 Well 5 16 1,3,4,9,12,13,14,1 246.3 1.2 Well 5 17 1,3,4,9,12,13,14,1 259.4 40.00 1.1 Well 5 18 1,3,4,9,12,13,14,1 251.7 1.1 Well 5 19 1,3,4,9,12,13,14,1 207.2 1.2 20 1,3,4,9,12,13,14,1Well 306.4 40.00 1.1 Well 21 1,3,4,9,12,13,14,1 230.2 1.2 22 1,3,4,9,12,13,14,1Well 234.2 20.00 1.2 Well 23 1,3,4,9,12,13,14,1 232.9 1.1 Well 24 1,3,4,9,12,13,14,1 228.1 1.2 25 1,3,4,9,12,13,14,1Well 203.0 40.00 1.2 Well 26 1,3,4,9,12,13,14,1 246.2 1.1 Well 27 1,3,4,9,12,13,14,1 254.2 1.2 Well system SCADA stuck in production mode, allowing the computer 1,3,4,9,12,13,14,1Well 11.6 20.00 1.2 system generated flow sheet to record flow while no production was 5 being applied to the plant. Flow data adjusted based on a manual read of 28 the flow monitoring equipment. Well 29 1,3,4,9,12,13,14,1 346.4 1.1 Well 30 1,3,4,9,12,13,14,1 388.0 1.2 Total 7,166.1 300 AVG. 238.9 #DIV/0! 9.6 1.1 #DIV/0! #DIV/0! #DIV/0! #DIV/0! ----- End of picture text -----
|Reported b Signature: Chlorine M|y ix Ratio =|y ix Ratio =|Title: Date: 5 quarts/gallons of Fernando Dongo|% chlorine added
12.5 Operator 10/1/2023|t NYS DOH Operator Certification Numbe Operator Grade Leve
gallons o|r NY0038297 l IIA, IIB, C, D f water in crock| |---|---|---|---|---|---|---| |||||||| ||||||||
DOH-360 (02/05) Page 1 of 2
Microbiological Samples and Free Chlorine Residual
==> picture [451 x 413] intentionally omitted <==
----- Start of picture text -----
Population Served: 2830 Sample Type Total E.coli Free Chlorine Sample Location Date of Sample 1.Routine 2.Repeat Coliform Positive Positive Residual (mg/l) Number of microbiological monitoring samples require 3 Mail Rm.Traditions 9/12/2023 1 Absent Absent 0.9 Number of microbiological monitoring samples taken: 3 Did an M&R violatio 2 W. Market 9/12/2023 1 Absent Absent 0.9 If “Yes,” check reason (s) belo 29 E. Market 9/12/2023 1 Absent Absent 0.8 Actual number of samples is fewer than required. Did not collect/analyze repeat sample. Did not collect/analyze for E. coli for positive total coliform from routine/repeat sample. Did an MCL violation occur? If “ Yes ,” check reason(s) below (see also Part 5, Table 6 for additional information). For systems collecting less than 40 samples per month: two or more of the samples (routine and /or repeat) are positive for total coliform (= total coliform MCL violation). For systems collecting 40 or more samples per month: more than 5% of the samples (routine and/or repeat) are positive for total coliform (= total coliform MCL violation). The original sample was E.coli positive and at least 1 repeat sample was positive for total coliform ( = E.coli MCL violation). Reminder: System must collect a minimum of five (5) routine microbiological monitoring samples during the month following a repeat sample collection. As required by 5-1.72, “Operation of a Public Water System,” a copy of this form shall be sent to your local health department by the 10th calendar day of the next reporting period. ----- End of picture text -----
Sample Collector(s): Bryan Smith Name of NYSDOH Certified Laboratory Pace Analytical
Did any MCL violation occur? If so, please describe: No
Did an emergency or low pressure problem occur? Did source water bypass an existing treatment process in the system?If so, please explain.
Comments:
DOH-360 (02/05) Page 2 of 2