Village of Red Hook Sewer Department Monthly Report July 2023
In the beginning of June, Village of Red Hook (Mayor Smythe and myself) met with C3ND (Fernando Dongo) and went on a tour of the Water Waste Treatment Plant (WWTP) to get a hands-on explana�on of how the new system is opera�ng, what is important for con�nued work on the sewer project and to discuss the general maintenance, upkeep, and opera�ons of the system.
There are s�ll a few items on the checklist needing to be completed prior to a full comple�on of the Sewer Project.
The village has asked for an update on the status of generator electrical box and a plan of ac�on to install proper equipment in case of a manual shut off/turn on is necessary.
The WWTP is opera�ng as normal with a discussion of future servicing to the exis�ng plant previously known as the Red Hook Commons plant. There was discussion about renaming the two plants for ease of iden�fica�on.
Reports show that some items will be tested daily while other monthly. As per the Village’s tour with C3ND, the recent reports generated that the general usage is slightly elevated than expected however, when combined with both plants we are well within our es�mated range. Secondly, all levels were at the lowest detectable or non-detectable range. At the �me these notes were writen the Monthly report was yet to be sent out to officials.