Village of Red Hook Water & Wastewater Treatment
7467 South Broadway, Red Hook, New York 12571
12/06/2022
==> picture [512 x 346] intentionally omitted <==
----- Start of picture text -----
Water System Wastewater System Water System Notes: Wastewater System Notes: Sample results for October 2022, with reporting submitted on or before November 28th 2022. All monthly coliform tests were completed Required Samples Result Compliance Monthly Total Coliform with no presence of coliform or e. coli BOD <4.0 October 2022 TSS 2.2 10 mg/L NH3 5.5 1.81 mg/L Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies Well controls need to be evaluated as communication issues Well Control Issues have occurred. Delaware Engineering is presenting to new Anoxic Mixers Currently a Medora mixer in place to keep Anoxic tank solids Town/Village Interconnect 2020 test indicated this was not a viable option for Village flow moving. May need to consider this in future updates. in case of emergency. Engineering review currently in place. Well Level/Flow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for Sand Filters have never been rebuilt or media replaced. Should communication to wells 14 & 15 as there is a short in wiring price and schedule for the near future. between the plant and the wells Sand Filter Rebuild Storage Tank Inspections All storage tanks have been inspected and are awaiting report. Train Down for Review One process train is down for review of deficiencies. Review to be completed this week and sent for review. Blower System Maintenance Parts have been ordered. Waiting for oil & belts. Pump Station Pump Station pumps clogging issues have been an issue for some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Backflow Prev. Replacement Facilities backflow Preventor in need of replacement. For Future Notes: ----- End of picture text -----