Red Hook WatchIndependent Community Resource

Water & Wastewater Treatment System Report — September 2022

Meetings/Documents/att::2022-11-14_minutes_351__b06
Attached document2022-11-14

==> picture [215 x 50] intentionally omitted <==

----- Start of picture text -----

Z 7467VillageSouth ofRedBroadway,Hook WaterRed Hook, & WastewaterNew York 12571 Treatment a sND 11/07/2022 Consulting ----- End of picture text -----

==> picture [464 x 299] intentionally omitted <==

----- Start of picture text -----

_ Water [System] a Wastewater System : Water System Notes: The PFOA/PFOS, 1,4 Dioxone annual samples were collectedfor Wastewater System Notes: Sample results for September 2022, with reporting submitted 2022 from each well with below regulatory limit results. on or before October 28th 2022. | ALE monthly coliform tests were completed Reguired Samples Result Compliance | Monthly Total Coliform | with no presence of coliform or e. coli BoD el

  • "| September 2022 TSS 37 10 mg/L NH3 <0.50 1.81 mg/L | _ _| Fecal Coliform <1.0 200/100 mL Deficiencies Deficiencies WeilWeill 39 VentPressure Gauge CompletedCompleted on 10/10 on 10/31 Anoxic Mixers pilimoving. teatatoal mixerMay need to considerMen this in to keepfutureoeupdates. tank solids Well 15 Number Placard Completed on 10/31 Sand Filter Rebuild Sand Filters have never been rebuilt or media replaced, Should Weill Contro! Issues Well controls need to be evaluated as communication issues price and schedule [for][ the][ near][future.] have occurred. Delaware Engineering is presenting to new Mayor. Train Down for Review One process train is down for review of deficiencies. Review to | be completed this week and sentfor review. Town/Village Interconnect 2020 test indicated this was not a viable option for Village Blower System Maintenance parts have been ordered. Waitingfor oil & belts. flow in case of emergency. Engineering review currently in |pump Station Pump Station pumps clogging issues have been an issue for place. some time. Pump Station mixing should be implemented to help with pump failure and pump station pump outs. Well Level/Fiow Well level monitors have been reviewed with a variety of repairs that were required. Currently looking at options for | gackflow Prev. Replacement Facilities backflow Preventor in need of replacement. communication to weils 14 & 15 as there is a short in wiring between the plant and the wells | Storage Tank Inspections All storage tanks have been inspected and are awaiting report. |For Future Notes: a — 1 ----- End of picture text -----